Suspension footbridge across the Elbe River
Gregor, Petr ; Kocourek, Petr (referee) ; Stráský, Jiří (advisor)
The objective of this master´s thesis is a design of suspension footbridge across the Elbe river. The footbridge is suspended construction by three spans. The brick deck is supported on the outer edges and it is kept in a parabolic arc. The suspension cables are kept at two inclined levels. The model is implemented in the program ANSYS. The solution is non-linear. The designe is according to the europien standart.
Experimental determination of the hydrodynamic load of the flooded bridge model
Naiser, Dominik ; Hrdlička, Libor (referee) ; Zubík, Pavel (advisor)
The diploma thesis deals with experimental determination of hydrodynamic load on the overflowed bridge deck model. In the first part of the thesis the author describes the analysis of the problem together with the basic physical laws and principles that are used or assumed in the measurement itself. In the second part the author describes the measurements in the laboratory of the Faculty of Civil Engineering and its gradual processing. At the end of the work are described the results of measurement, their comparison with numerical modeling, other authors and their possible use in practice.
Plan curved arch footbridge
Trenz, Jan ; Romportl, Tomáš (referee) ; Stráský, Jiří (advisor)
The scope of thesis is to design a curved arch footbridge. The main structure consists of composite deck supported by steel arch. The focus is on finding optimal shape of arch and proper cross-sections of elements. Bridge is analysed according to limit states.
The two-track railway bridge
Loučka, Miroslav ; Karmazínová, Marcela (referee) ; Puchner, Josef (advisor)
Master´s thesis describes the design of the railway bridge in Ústí nad Labem. Length of the structure is 200.00 meters, the height of the structure is 32.61 m and width of the structure is 12.10 m. Main structural system is composed of a spatial strut-frame structures. The bridge carries an important railway stations between Usti nad Labem Západ, Usti nad Labem Střekov. Part of the proposal is a footbridge for pedestrians.
Design of a railway bridge with an extremely compressed construction height according to MVL 115
Svoboda, Petr ; Šoukalová, Gabriela (referee) ; Kožik, Libor (advisor)
The aim of the thesis was a static and economic comparison of three variants of railway steel bridges with extremely compressed construction height according to the Bridge Model List (MVL) 115. A 3D model was created in RFEM for all variants. The bridge alternatives were evaluated for permanent loads, loads from rail traffic, and other significant loads. The option that came out best in terms of cost was then reassessed in more detail as part of a separate structural calculation.
Preparation and realization of the railway viaduct in Ostrov nad Oslavou
Šťastný, Jiří ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
This Diploma thesis deals with the preparation of the realization of the railway viaduct in Ostrov nad Oslavou. Realization of major technological stages is addressed in building technological study. Technological processes of each sub-job phases are supplemented by technical regulations, the design of the main building machines and mechanisms, inspection and test plan, schedule of occupational health and safety, time and financial plan construction, construction budget, a plan for securing material resources. I also worked out the technical report of the building sites facilities including drawings needed. I also worked out design rehabilitation of the substructure of the railway viaduct, which is consist of technical regulations for remediation work and drawings.
Static analysis of arch bridge structure
Farkasová, Zuzana ; Zídek,, Rostislav (referee) ; Hradil, Petr (advisor)
The main task of the Bachelor´s thesis is to do a static analysis of arch bridge construction with two span and bridge deck hanged on pulled cables. My task was to construct numerical model of bridge construction, to make load solution and to evaluate results. I have learned about ANSYS programme during processing this thesis, especially about its working environment WORKBENCH.
Footbridge in Kyjov
Maleňák, Jan ; Štrba, Michal (referee) ; Barnat, Jan (advisor)
The content of diploma thesis is design of the construction of steel footbridge for pedestrians and cyclists. The footbridge is across the railway in Kyjov. The design will be processed in two options of structure. The selected option will be developed in greater detail. The span of footbridge is 35 m and the width is 3 m. The contruction is made by two arched beams which are connected to the bridge deck by suspenders. The stability of the construction is provided by longitudinal bracing under the bridge deck and the bracing between the arched beams. The assessment of the structure was made according to valid standards.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
The Footbridge
Rusňák, Marek ; Šmak, Milan (referee) ; Buchta, Stanislav (advisor)
The main goal of this diploma thesis is a design and verification of a steel footbridge crossing the river Dřevnice in Zlín. As the basic material steel S355 and for selected members steel S235 was chosen. There are two structural variants designed in the introductory part of the thesis. These variants are then compared and in the next part only selected, more favourable variant, is addressed. The selected variant is a truss footbridge with a bridge deck at the bottom and curved top chords. The bridge deck consists of floor beams and steel plate with longitudinal stiffeners. The span of the structure is 35.0 m, the width of the footbridge is 3.9 m and its height in the middle of the span is 4.2 m.